Requirement Communication and Solution Confirmation
1. Demand Import: You only need to specify the target market and application scenario. Based on local voltage, climate conditions, and energy efficiency standards, we recommend a matching EVI DC inverter platform or a 80°C high-temperature dedicated model. 2.Technical Confirmation: Both parties finalize customization details—sheet metal color, silk-screened logo, control panel UI, and wire controller language. Engineers provide 3D drawings and BOM lists, locking in compressor brand and heat exchanger material.
sample prototyping
1. Precision Sampling: Procure custom components, organize dedicated assembly teams for specialized production, and strictly adhere to the design specifications from drawings. 2. Extreme Verification: Samples are sent to a -30°C enthalpy difference laboratory for specialized testing of your product -EVI DC Inverter Model: Verify the low-temperature heating attenuation rate and energy efficiency ratio. -Pool heat pump: Simulate constant temperature conditions to verify the anti-corrosion performance of titanium tube heat exchangers. -80°C high-temperature machine: Testing the high-voltage protection threshold and system stability.
Batch Production and Quality Inspection
1. Flexible Scheduling: Production of bulk orders commences after sample confirmation and signing. Mixed order production is supported, allowing trial orders with a minimum quantity of one container to be combined with main orders, effectively controlling costs. Process Control: - Key process traceability: The welding process complies with the IPC-610 standard, and the leak detection process employs a high-sensitivity refrigerant leak detector. - Online Monitoring: Each DC frequency conversion drive board records voltage and current waveforms. 3 Full Inspection and Warehousing: Each unit has undergone: - Air tightness test: Fill with high-pressure nitrogen, maintain pressure for 24 hours with zero leakage. - Electrical safety testing: Comprehensive inspection of voltage withstand and grounding resistance. - Operation Test: Power on the air-source/pool heat pump for 20 minutes, and record the temperature difference between inlet and outlet water, current, suction/exhaust pressure.
Logistics delivery
1.Export Preparation: Provide fumigated wooden pallets, design and produce shipping marks as per your requirements, and organize the complete set of inspection and customs clearance documents. 2.International Shipping: Assist in coordinating with freight forwarders for booking, arrange door-to-door ocean or air freight services, and provide real-time logistics tracking updates. 3. Documents with the shipment: The English versions of the "Factory Inspection Report," "Installation Manual," "Warranty Card," and relevant certification documents are provided with the container.
Specialized in product
From Chinese Factory to Global Market, Quality Never Changes
We strictly abide by the commercial confidentiality agreement, and your product design, customer information, and pricing strategy will be fully protected.